Imported aluminium windows are not automatically cheaper or better than local windows. Compare the complete landed and installed scope, destination requirements, replacement-part support and delivery responsibilities. Overseas shipping and direct site delivery must be confirmed for the actual order; factory completion does not mean the windows are ready to install.
A low factory price can be useful, but it is only one line in the purchase. The buyer needs to know who carries the shipment through each handoff and who fixes a mismatch when the units reach the building.
Build a landed-cost comparison
| Cost or responsibility | What to confirm |
|---|---|
| Manufactured units | Opening schedule, glass, hardware, finish and packaging |
| International transport | Named delivery term, place and included transport stages |
| Destination charges | Broker, clearance, taxes and charges assessed for the shipment |
| Final delivery | Vehicle access, unloading, lifting and storage |
| Installation | Local installer, preparation, fitting and finishing |
| Aftercare | Parts, damage claims, glazing replacement and service labour |
Have the freight provider or customs broker establish shipment-specific charges rather than using a generic online allowance. Record the named delivery place. “Delivered” can describe very different handoffs if one quote ends at a port and another includes the project entrance.

Verify suitability for the destination
Ask the project designer to identify required performance and documentation before production. A certificate applicable in one market is not automatically approval for another. The FGIA product-certification overview, for example, distinguishes structural, air and water verification from thermal certification; it should not be read as a universal import checklist.
Confirm the exact model and configuration covered by the documents. Keep the approved drawings, product labels and glass specifications linked to each crate or opening mark. This makes delivery inspection and later service far more straightforward.
Can the shipment go straight to the site?
Possibly, if the supplier and transporter agree and the site can receive it. Check road access, turning space, overhead restrictions, unloading equipment and a protected storage area. Ask who opens and inspects the crates and how transit damage must be reported.
Use the new-house supply handoff to coordinate the builder. If the opening is not ready, agree storage arrangements before dispatch rather than expecting installers to solve it on delivery day.
Frequently asked questions
Does Forge Windows ship to my country?
This article does not confirm a current shipping offer for every destination. Send the country, project location and opening schedule and ask for written confirmation of supply, documentation, transport scope and aftercare before making a purchase decision.
How soon can delivery happen after ordering?
Ask for separate dates or ranges for approval, production, dispatch, transit, clearance and final delivery. The manufacturing-time guide explains why these milestones should not be collapsed into one lead-time promise.
When might a local supplier be preferable?
Consider local surveying, shorter service routes, replacement parts and responsibility for fitting. Compare these against the imported option’s complete scope. The useful choice is the one with a verifiable specification and workable support for your project, not a country-of-origin label alone.